Hydrocarbon-funded, procured without external finance — invisible to most PPI datasets.
Value
$2bn
Target
2028
Bankability
72
Near-universal power access and a heavy state-led build programme; the binding constraint is hydrocarbon-linked fiscal cyclicality, not connections.
Continental average 37.13
22 GW installed
54 registry projects
Estimated investment requirement
| Project | Sector | Value | Status | Target |
|---|---|---|---|---|
Algiers Metro Extensions Hydrocarbon-funded, procured without external finance — invisible to most PPI datasets. | Mass transit | $2bn | Construction | 2028 |
2Africa Subsea Cable The longest subsea cable ever built; encircles the continent with 46 landings. | Subsea | $1bn | Operational | 2024 |
Medusa Submarine Cable The Mediterranean rim's first open-access cable independent of the big carrier consortia. | Subsea | $0.4bn | Construction | 2026 |
Hydrocarbon-funded, procured without external finance — invisible to most PPI datasets.
The longest subsea cable ever built; encircles the continent with 46 landings.
The Mediterranean rim's first open-access cable independent of the big carrier consortia.
Generate an investment-committee note on Algeria: position, what is actually being built, financing structure, key risks and what to watch — grounded in the data on this page.