Central Africa · Capital Kinshasa

DR Congo

Grand Inga remains the largest unbuilt hydro proposition on earth; the Lobito Corridor is the live one.

AIDI rank 48 of 54105.6m people$67bn GDP11 tracked projects
ZimbabweZambiaUgandaTunisiaTogoTanzaniaEswatiniSouth SudanSudanSouth AfricaSomaliaSomalilandSierra LeoneSenegalSão Tomé and PríncipeRwandaNigeriaNigerNamibiaMozambiqueMoroccoWestern SaharaMauritaniaMaliMalawiMadagascarLibyaLiberiaLesothoKenyaGuinea-BissauGuineaGhanaGambiaGabonEthiopiaEritreaEquatorial GuineaEgyptDjiboutiCôte d'IvoireDR CongoRepublic of the CongoComorosChadCentral African RepublicCabo VerdeCameroonBurundiBurkina FasoBotswanaBeninAngolaAlgeria

AIDI trajectory 2015—2025

Commitments vs disbursement, $bn

— committed--- disbursed

Infrastructure sub-indices

Project register · 11 tracked (loading)

The largest unbuilt hydro proposition on earth. Repeatedly reconfigured; offtake from South Africa remains the pivot.

Value
$14bn
Target
2032
Bankability
10

The flagship Western counter-offer to Chinese resource-corridor finance. Copper and cobalt to the Atlantic.

Value
$2.3bn
Target
2027
Bankability
88

The Congolese leg is where the Lobito thesis is actually tested.

Value
$1.6bn
Target
2028
Bankability
84

A mining company rebuilding national hydro assets to power itself is the DRC energy market in miniature.

Value
$1.2bn
Target
2026
Bankability
69

Ownership litigation has frozen one of the world's largest hard-rock lithium deposits.

Value
$0.9bn
Target
2029
Bankability
2

Three-country offtake makes the credit stronger on paper and slower in practice.

Value
$0.7bn
Target
2029
Bankability
55

The first intercontinental route to run overland through the African interior rather than around it.

Value
$0.6bn
Target
2027
Bankability
76

A city of seventeen million with intermittent supply in most communes; utility reform precedes any capex.

Value
$0.6bn
Target
2030
Bankability
49

Edge capacity in markets that global operators still treat as too small.

Value
$0.5bn
Target
2027
Bankability
86

The beneficiation test case: whether battery value-add can be retained at source.

Value
$0.4bn
Target
2029
Bankability
35

The middle-mile problem in its purest form: cheap bandwidth at the coast, none inland.

Value
$0.3bn
Target
2027
Bankability
76

Tracked value by sector, $bn

AI briefing note

Generate an investment-committee note on DR Congo: position, what is actually being built, financing structure, key risks and what to watch — grounded in the data on this page.