Manganese volumes fund the line; passenger service is the political condition attached.
Value
$0.8bn
Target
2029
Bankability
54
Manganese rail (Transgabonais) and the debt-for-nature swap that refinanced part of it.
Continental average 37.13
0.7 GW installed
22 registry projects
Estimated investment requirement
| Project | Sector | Value | Status | Target |
|---|---|---|---|---|
Transgabonais Rail Recapitalisation Manganese volumes fund the line; passenger service is the political condition attached. | Rail | $0.8bn | Structuring | 2029 |
Manganese volumes fund the line; passenger service is the political condition attached.