Grid stability, not capital, is the first constraint on a 1 GW unit in a 3 GW system.
Kenya
90%+ renewable grid, the deepest geothermal base in Africa, and the region's most tested PPP framework.
Continental average 37.13
3.3 GW installed
150 registry projects
Estimated investment requirement
AIDI trajectory 2015—2025
Commitments vs disbursement, $bn
Infrastructure sub-indices
Project register · 15 tracked (loading)
| Project | Sector | Value | Status | Target |
|---|---|---|---|---|
Kenya Nuclear Programme Phase I Grid stability, not capital, is the first constraint on a 1 GW unit in a 3 GW system. | Nuclear | $4bn | Concept | 2037 |
Kenya SGR Naivasha-Kisumu-Malaba The unfinished half of the SGR. Without Malaba, the Ugandan traffic case never materialises. | Rail | $3.6bn | Structuring | 2030 |
Northern Corridor Upgrade Transit times published monthly by the corridor authority — the best freight data in East Africa. | Roads + rail | $3.2bn | Construction | 2028 |
Olkaria Geothermal Expansion Africa's geothermal core. Kenya remains the only country converting Rift resource at scale. | Geothermal | $1.1bn | Construction | 2027 |
2Africa Subsea Cable The longest subsea cable ever built; encircles the continent with 46 landings. | Subsea | $1bn | Operational | 2024 |
Tatu City Special Economic Zone Privately master-planned urbanism, with all the governance questions that implies. | SEZ | $1bn | Construction | 2030 |
Lake Turkana Wind Power The transmission line arrived two years after the turbines — the canonical evacuation-risk case study. | Wind | $0.7bn | Operational | 2019 |
Cassava / Nvidia AI Factory The first serious attempt at sovereign African AI compute capacity. | Compute | $0.7bn | Construction | 2026 |
Nairobi Bulk Water Programme Non-revenue water reduction is worth more than new supply, and is far harder to finance. | Bulk supply | $0.6bn | Structuring | 2029 |
Umoja Fibre Route (Google) The first intercontinental route to run overland through the African interior rather than around it. | Terrestrial + subsea | $0.6bn | Construction | 2027 |
Kenya Education Infrastructure Programme Classroom construction under CBC reform; per-unit cost data is among the most transparent in the region. | Education | $0.6bn | Construction | 2028 |
Mombasa Port Berth 22 & Container Terminal III Capacity is no longer the East African bottleneck; dwell time and inland clearance are. | Ports | $0.5bn | Construction | 2027 |
Africa Data Centres Lagos & Nairobi The DFC's largest digital commitment in Africa; power reliability is priced into every megawatt. | Data centres | $0.5bn | Construction | 2027 |
Africa-1 Cable Gulf-anchored capacity into East Africa; diversifies away from the Suez chokepoint only partially. | Subsea | $0.3bn | Construction | 2026 |
LEO Satellite Backhaul Rollout Regulatory approval, not capital, determines the map. Licensing has moved faster than any fibre programme. | Satellite | $0.3bn | Operational | 2025 |
The unfinished half of the SGR. Without Malaba, the Ugandan traffic case never materialises.
Transit times published monthly by the corridor authority — the best freight data in East Africa.
Africa's geothermal core. Kenya remains the only country converting Rift resource at scale.
The longest subsea cable ever built; encircles the continent with 46 landings.
Privately master-planned urbanism, with all the governance questions that implies.
The transmission line arrived two years after the turbines — the canonical evacuation-risk case study.
The first serious attempt at sovereign African AI compute capacity.
Non-revenue water reduction is worth more than new supply, and is far harder to finance.
The first intercontinental route to run overland through the African interior rather than around it.
Classroom construction under CBC reform; per-unit cost data is among the most transparent in the region.
Capacity is no longer the East African bottleneck; dwell time and inland clearance are.
The DFC's largest digital commitment in Africa; power reliability is priced into every megawatt.
Gulf-anchored capacity into East Africa; diversifies away from the Suez chokepoint only partially.
Regulatory approval, not capital, determines the map. Licensing has moved faster than any fibre programme.
Tracked value by sector, $bn
AI briefing note
Generate an investment-committee note on Kenya: position, what is actually being built, financing structure, key risks and what to watch — grounded in the data on this page.