The most ambitious regional solar programme and the most politically exposed.
Value
$3bn
Target
2030
Bankability
42
Kandadji dam and the Niger-Benin pipeline are the two assets that reshape the balance sheet.
Continental average 37.13
0.3 GW installed
64 registry projects
Estimated investment requirement
| Project | Sector | Value | Status | Target |
|---|---|---|---|---|
Desert to Power G5 Sahel The most ambitious regional solar programme and the most politically exposed. | Solar + storage | $3bn | Structuring | 2030 |
Kandadji Dam Suspended following the 2023 political rupture — a live case study in political-risk crystallisation. | Multipurpose | $1.3bn | Stalled | 2030 |
The most ambitious regional solar programme and the most politically exposed.
Suspended following the 2023 political rupture — a live case study in political-risk crystallisation.
Generate an investment-committee note on Niger: position, what is actually being built, financing structure, key risks and what to watch — grounded in the data on this page.