Rwanda
Execution quality far above income level: Bugesera airport, methane-to-power, and Kigali's logistics ambitions.
Continental average 37.13
0.3 GW installed
83 registry projects
Estimated investment requirement
AIDI trajectory 2015—2025
Commitments vs disbursement, $bn
Infrastructure sub-indices
Project register · 7 tracked (loading)
| Project | Sector | Value | Status | Target |
|---|---|---|---|---|
Northern Corridor Upgrade Transit times published monthly by the corridor authority — the best freight data in East Africa. | Roads + rail | $3.2bn | Construction | 2028 |
Bugesera International Airport A hub bet rather than a demand response; the Qatari stake is the substance. | Aviation | $2bn | Construction | 2028 |
Kigali Innovation City The Africa50 flagship: infrastructure as a platform for services exports rather than commodities. | SEZ | $2bn | Construction | 2029 |
Ruzizi III Hydropower Three-country offtake makes the credit stronger on paper and slower in practice. | Hydro | $0.7bn | Structuring | 2029 |
Umoja Fibre Route (Google) The first intercontinental route to run overland through the African interior rather than around it. | Terrestrial + subsea | $0.6bn | Construction | 2027 |
LEO Satellite Backhaul Rollout Regulatory approval, not capital, determines the map. Licensing has moved faster than any fibre programme. | Satellite | $0.3bn | Operational | 2025 |
Rwanda National Broadband & Smart City Small absolute numbers, best-in-class execution; the policy reference case for digital public infrastructure. | Fibre + services | $0.2bn | Construction | 2027 |
A hub bet rather than a demand response; the Qatari stake is the substance.
The Africa50 flagship: infrastructure as a platform for services exports rather than commodities.
Three-country offtake makes the credit stronger on paper and slower in practice.
The first intercontinental route to run overland through the African interior rather than around it.
Regulatory approval, not capital, determines the map. Licensing has moved faster than any fibre programme.
Small absolute numbers, best-in-class execution; the policy reference case for digital public infrastructure.