Negotiated for over a decade; the HGA remains unsigned.
Tanzania
SGR, Julius Nyerere hydro (2,115MW) and the EACOP pipeline — the largest coordinated build in East Africa.
Continental average 37.13
3.1 GW installed
153 registry projects
Estimated investment requirement
AIDI trajectory 2015—2025
Commitments vs disbursement, $bn
Infrastructure sub-indices
Project register · 7 tracked (loading)
| Project | Sector | Value | Status | Target |
|---|---|---|---|---|
Tanzania LNG Negotiated for over a decade; the HGA remains unsigned. | LNG | $42bn | Feasibility | 2033 |
Tanzania Standard Gauge Railway Electrified SGR to Mwanza — the most technically ambitious rail programme in East Africa. | Rail | $10.4bn | Construction | 2028 |
Julius Nyerere Hydropower Built inside a World Heritage site; doubles national capacity in a single asset. | Hydro | $3.6bn | Construction | 2026 |
Kabanga Nickel Hydromet refining in-country is the state's condition; it is also the project's largest technical risk. | Mine + refinery | $1.6bn | Structuring | 2029 |
TAZARA Rehabilitation Concession Fifty years after construction, the original Chinese railway diplomacy asset is being recapitalised. | Rail | $1.4bn | Structuring | 2029 |
Mission 300 Tanzania Compact Access programmes rarely appear in pipeline databases yet absorb a growing share of concessional flows. | Access / distribution | $1.2bn | Structuring | 2030 |
Dar es Salaam BRT Phases 3-5 The highest-ridership BRT in sub-Saharan Africa. | Mass transit | $0.7bn | Construction | 2027 |
Electrified SGR to Mwanza — the most technically ambitious rail programme in East Africa.
Built inside a World Heritage site; doubles national capacity in a single asset.
Hydromet refining in-country is the state's condition; it is also the project's largest technical risk.
Fifty years after construction, the original Chinese railway diplomacy asset is being recapitalised.
Access programmes rarely appear in pipeline databases yet absorb a growing share of concessional flows.
The highest-ridership BRT in sub-Saharan Africa.