The first Africa-Europe electricity link financed to close. A precedent with more strategic weight than size.
Value
$0.9bn
Target
2028
Bankability
83
Strong stock, weak flow. Sovereign credit stress has slowed the PPP pipeline despite a credible regulatory base and Medlink interconnection potential.
Continental average 37.13
6.2 GW installed
103 registry projects
Estimated investment requirement
| Project | Sector | Value | Status | Target |
|---|---|---|---|---|
ELMED Tunisia-Italy Interconnector The first Africa-Europe electricity link financed to close. A precedent with more strategic weight than size. | HVDC | $0.9bn | Financial close | 2028 |
Medusa Submarine Cable The Mediterranean rim's first open-access cable independent of the big carrier consortia. | Subsea | $0.4bn | Construction | 2026 |
The first Africa-Europe electricity link financed to close. A precedent with more strategic weight than size.
The Mediterranean rim's first open-access cable independent of the big carrier consortia.
Generate an investment-committee note on Tunisia: position, what is actually being built, financing structure, key risks and what to watch — grounded in the data on this page.